Mica
Product
DesktopProducts overviewAI hardware engineerAI PCB designerAsk MicaDownload
Developers Coming soonEnterprise Coming soon
Resources
DocsTutorialsUse casesCompareGlossaryFAQSecurityTransparencyUpdates
Pricing
Talk to usJoin the waitlist
Product
DesktopProducts overviewAI hardware engineerAI PCB designerAsk MicaDownload
Resources
DocsTutorialsUse casesCompareGlossaryFAQSecurityTransparencyUpdates
Developers Coming soonEnterprise Coming soon
PricingNewsTalk to us
Join the waitlist
Mica

Windows alpha. Designs stay on your computer.

Product

  • Desktop
  • Products
  • Download
  • Pricing
  • Updates

Capabilities

  • AI hardware engineer
  • AI PCB designer
  • Ask Mica
  • MCP
  • Integrations

Use cases

  • What you can build
  • Wearables
  • Connected sensors
  • Motor control
  • All use cases

Resources

  • Docs
  • Tutorials
  • Compare
  • Glossary
  • FAQ

Company

  • Security
  • Transparency
  • Careers
  • Events
  • Contact
  • Explore
  • Developers Coming soon
  • Enterprise Coming soon

Programs

  • Startups
  • Students
  • Nonprofits

Legal

  • Terms of Service
  • Privacy Policy
  • Cookie Policy
  • EULA
  • Usage Policy
  • Responsible Disclosure
  • Policies
© 2026 Mica. Mica by MuscoLabsDrafts of legal terms are pending lawyer review.
Home/Glossary/DRC: design rule check
Glossary

DRC: design rule check

DRC (design rule check) tests whether the board can actually be made. It checks gaps between copper, hole sizes, the copper rings around holes, the protective coating, and whether every connection has been routed. It does not tell you the circuit is correct. It only tells you the board can be built.

What it checks

A DRC rule deck (the set of rules a check runs) covers several groups. It checks clearances between tracks, pads, and the board edge. It checks drill limits such as minimum hole size, hole-to-hole spacing, and hole-to-copper spacing. It checks annular ring minimums, silkscreen (the printed labels on the board) over pads, and solder-mask slivers. It also checks for unrouted or partly routed nets. High-speed decks add differential-pair rules (rules for the two copper paths that carry one signal) for pair gap, length skew and via symmetry. Each rule encodes a limit from the fab's (the factory's) process capabilities, plus margin, because designing exactly to the fab minimum is designing to fail.

What it doesn't check

DRC is blind to intent. It cannot tell you the circuit is correct, only that it can be built. A DRC-clean board can implement the wrong schematic (the drawing of what connects to what). That is what ERC (electrical rule check, on the netlist before layout) and LVS (layout vs. schematic, the check that the copper matches the drawing) are for. DRC also does not check signal integrity (whether signals arrive cleanly), power integrity (whether the supply stays steady) or thermal performance. And a DRC only runs the rules in its deck: an unchecked rule is a blind spot, not a pass.

How MICA uses DRC

The build gate

MICA runs a geometric DRC. The deck covers clearances, annular ring, unrouted nets, dropped parts, pours, declared antenna keepouts, and diff-pair gap, skew and via matching. It does not check silkscreen or solder mask slivers. An impedance rule exists, but the normal build sets no target, so it does not run. A failed board is shown as failed, and a board that did not route is never exported. Gerbers are the files a factory uses to make the board. Signal integrity is not checked. The practical DRC tutorial explains how to read violations.

Rule decks, fabs, and margins

DRC rules come from the fab's process capabilities. Every fab publishes two numbers: the minimum it can do and the preferred range it does reliably. Design to the preferred range. A board that passes DRC at the absolute minimums will have a lower yield (fewer good boards per batch) than one with comfortable margins. The cost of a re-spin (a new round of design and manufacture) dwarfs any density you gained. Keep one rule deck per fab you use, and re-run DRC against the actual fab's deck before ordering, not the generic defaults. Mature teams run DRC in CI (continuous integration, an automatic check on every change) on every change to the layout, the same way software teams run tests. The check is cheap, and a defect that slips through is expensive.

See also

  • Glossary: ERC (electrical rule check)
  • Glossary: LVS (layout vs. schematic)
  • Tutorial: DRC explained, practically

Start with a description.

Mica is in early development. Join the list and we will tell you when it is ready to try.

By joining, you agree to our Privacy Policy. We will only email you about Mica’s launch, and you can ask to be removed at any time.

We will email you when there is something to try. No spam.