Mica
Product
DesktopProducts overviewAI hardware engineerAI PCB designerAsk MicaDownload
Developers Coming soonEnterprise Coming soon
Resources
DocsTutorialsUse casesCompareGlossaryFAQSecurityTransparencyUpdates
Pricing
Talk to usJoin the waitlist
Product
DesktopProducts overviewAI hardware engineerAI PCB designerAsk MicaDownload
Resources
DocsTutorialsUse casesCompareGlossaryFAQSecurityTransparencyUpdates
Developers Coming soonEnterprise Coming soon
PricingNewsTalk to us
Join the waitlist
Mica

Windows alpha. Designs stay on your computer.

Product

  • Desktop
  • Products
  • Download
  • Pricing
  • Updates

Capabilities

  • AI hardware engineer
  • AI PCB designer
  • Ask Mica
  • MCP
  • Integrations

Use cases

  • What you can build
  • Wearables
  • Connected sensors
  • Motor control
  • All use cases

Resources

  • Docs
  • Tutorials
  • Compare
  • Glossary
  • FAQ

Company

  • Security
  • Transparency
  • Careers
  • Events
  • Contact
  • Explore
  • Developers Coming soon
  • Enterprise Coming soon

Programs

  • Startups
  • Students
  • Nonprofits

Legal

  • Terms of Service
  • Privacy Policy
  • Cookie Policy
  • EULA
  • Usage Policy
  • Responsible Disclosure
  • Policies
© 2026 Mica. Mica by MuscoLabsDrafts of legal terms are pending lawyer review.
Home/Tutorials/How to read a verification report
Tutorial · 7 min read

How to read a verification report

MICA reports what was checked and what was not, in plain language. A green report does not mean "this board will work". It means these specific checks passed, and here are the blind spots. This tutorial teaches you to read it that way.

What the report covers

A passing board means the checks below passed. A gate is a check that must pass. The reports are your evidence for each one:
  • ERC, run twice. ERC (electrical rule check) is a test that the wiring makes sense. It runs once on the generated schematic and again after routing, because routing can add errors the first run did not see.
  • Geometric DRC. DRC (design rule check) tests the board against manufacturing rules. It covers clearances, annular ring, unrouted nets, dropped parts, and differential-pair gap, skew and via coherence. Annular ring is the ring of copper around a hole. A via is a small hole that connects layers. Skew is the difference in arrival time.
  • Placeholder firmware compiled with -Werror and tested on your computer. Firmware is the software that runs on the chip. -Werror treats compiler warnings as errors. The tests run against a simulated register map, not on a chip. This firmware must not be flashed.
  • Conformance with your brief. MICA compares the build with what you asked for, and it says NOT DONE when the device would not work. Power and BLE link budget calculators exist, but the normal build does not run them yet.
  • Enclosure fit checked. The board must fit its generated case. The case has no connector openings yet.

Read the not checked section first

It sounds backward, but it is correct. The most important part of the report is what it says was not checked. An unrun check you do not know about is a blind spot, not a pass. Known blind spots:
  • Pin data. Only about 30 parts have checked pin data. A pin map is the list that says what each pin does. Confirm the pin maps for your critical parts against the datasheets. A datasheet is the manufacturer's data sheet.
  • SPICE runs on demand, not in every build. SPICE is a circuit simulation program. If you need circuit simulation for your design, run it explicitly rather than assuming it happened.

What a pass does and does not mean

Verified, not proven

A passing report means the checks above ran and passed. It does not mean a board has been built and powered on. No MICA-generated board has been fabricated yet. The checks run in software and the output includes real Gerbers. Gerbers are the files a factory uses to make the board. We will not call a board "fab-ready" without proof. Nothing has reached ready to order. Treat a passing report as a reason to review, not as a guarantee.
The same boundary applies inside the checks. DRC verifies geometry, the shape and spacing of copper, not intent. A board can be DRC-clean and implement the wrong circuit. That is ERC and LVS's job. LVS (layout versus schematic) checks that the finished layout matches the schematic. Any check is only as good as its rule deck. A rule deck is the list of checks that run. A check that is not in the deck does not run, which is exactly why the report lists what was not checked.

When a build fails

A failing board is a normal outcome, not an error to hide. A board that did not route is never exported, so no Gerbers are generated for it. When you get a failure, fix violations in this order. Unrouted nets first, because they are functional failures. Then anything involving drills and annular rings, because they stop the factory. Then clearances, which usually mean nudging placement or widening the board a millimeter. When clearance violations cluster in one area, the problem is placement, not routing. Move the parts instead of fighting the router. Always re-run after every fix. Moving one track to fix a clearance often creates another.

Before you order: the checklist

  • Read the not checked section and decide whether each blind spot matters for your board.
  • Review the Gerbers in a viewer. MICA includes a Gerber viewer. RS-274X is the standard Gerber file format. Check every layer, especially mask and silk, because DRC does not check them.
  • Confirm the pin maps for your critical parts against datasheets.
  • Get a second pair of eyes on the schematic for anything going to production quantities. A schematic is a map of which parts connect to which. Automated checks catch classes of errors, not all errors.

See also

  • Tutorial: what a design rule check tests
  • FAQ: can I manufacture from MICA output?
  • Tutorial: from an idea to factory files
  • Glossary: DRC (the test that a board can be manufactured)

Start with a description.

Mica is in early development. Join the list and we will tell you when it is ready to try.

By joining, you agree to our Privacy Policy. We will only email you about Mica’s launch, and you can ask to be removed at any time.

We will email you when there is something to try. No spam.